INSP-Final Inspection | 1/20/2005 | 1/21/2005 | 1/21/2005 | P | PASS |
Rick Jackson
|
|
|
CLIFF; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles All items corrected; final okay 1/21/2005 5:11:00 PM
|
INSP-Final Inspection | 12/27/2004 | 12/29/2004 | 12/29/2004 | P | FAIL |
Rick Jackson
|
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Stopped inspection - room sounder bases didn't sound on general alarm; re-inspection fee will be added and must be paid prior to another inspection 12/29/2004 5:33:27 PM
|
INSP-Final Inspection | 11/4/2004 | 11/8/2004 | 11/8/2004 | A | CANC |
Rick Jackson
|
|
|
###-#### Cliff Miller rescheduled for late afternoon per Cliff 11/8/2004 9:42:55 AM
|
INSP-Final Inspection | 11/8/2004 | 11/8/2004 | 11/8/2004 | P | FAIL |
Rick Jackson
|
|
|
4:00 pm per Cliff Strobes in commonareas not working and sounder bases not working on general alarm; sounder base room detectors generate temporal tone with room detector in alarm 11/8/2004 5:12:13 PM
|
INSP-Final Inspection | 9/27/2004 | 9/29/2004 | 9/29/2004 | P | FAIL |
Rick Jackson
|
|
|
as late as possible please///clifford; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Room sounder base detectors are not temporal tone on general alarm; strobes not sync'd; EOL voltage drop 20.5 on 6th floor circuit - all others are okay; need maps; mount remote annunciator permanently 9/30/2004 9:12:25 AM
|
INSP-Final Inspection | 8/31/2004 | 9/20/2004 | 9/20/2004 | A | FAIL |
Rick Jackson
|
|
|
###-#### - cliff Need temporal tone on all sounder bases; sounder bases generate general alarm not supervisory as shown on matrix and drop mags for doors; elevator shunt not working; lockout for 120 volt breaker for shunt as it isn't supervised; all troubles okay on panel; need voltage drops on NAC's and test alarm notification; review the computer program for this system 9/20/2004 4:24:04 PM
|
INSP-Final Inspection | 8/31/2004 | 9/13/2004 | 9/13/2004 | A | FAIL |
Rick Jackson
|
|
|
###-#### - cliff Need correct sized batteries for panel on 6th floor; need breaker location on all panels and lockout on breaker; point 45 not used as FACP area has two detectors in area; need descriptors for "modules" to indicate location; remote annunciator not installed permanently in front desk area; tested devices in hallways/closets on 2-6 floors; need to test kitchen hood; sprinkler devices, heat detectors in laundry, drops on NAC's as 14 gauge wire is used, penthouse pre-action troubles/alarm, duct detectors, and sounder base devices in rooms and notification in all areas 9/13/2004 11:46:31 AM
|
INSP-Conference | 8/26/2004 | 8/27/2004 | 8/27/2004 | A | PART |
Rick Jackson
|
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Annette Moore Met with Cliff about testing the system; will need to verify smoke detectors on wall in room; need to verify wire size/calc's for NAC's prior to testing 8/27/2004 11:03:16 AM
|
FIR-Aging Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 | | PASS |
Rick Jackson
|
|
|
Per Ken this is phased work that is scheduled for completion by 12/04. The first floor is in progress and the head end is completed. There is an agreement with BFD for the phasing. 3/4/2004 9:54:48 AM
|