INSP-Final Inspection | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PASS |
Troy Cobbley
|
|
|
fire sprinkler system finaled 3/2/2004 10:48:56 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | FAIL |
Troy Cobbley
|
|
|
Anti-freeze valve must meet requirements of review note #24. Forward flush the backflow preventor. Provide flow switch with means for testing, valve supervision, and check valve for hose system. Resubmit plans per review notes
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 1:35:49 PM. Contact: ###-####. UG flush only - okay 1/28/2004 12:41:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PART |
Rick Jackson
|
|
|
overhead hydro okay 1/28/2004 3:52:42 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PART |
Troy Cobbley
|
|
|
Office areas are ok to cover 1/27/2004 1:49:28 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2004 | 1/13/2004 | 1/13/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 2:25:09 PM. Contact: ###-####. okay to cover entyry and restrooms as items from previous inspection are okay 1/13/2004 10:03:13 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2004 | 1/9/2004 | 1/9/2004 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for the entry area and the two restrooms. The hangers in the entry area need to be attached to the top of the structure and the pendants exceed 3' vertically from the peak. The upright sprinkler heads over both of the restrooms are overspaced and will require additional upright coverage 1/9/2004 2:08:16 PM
|