INSP-Final Inspection | 12/31/2003 | 1/5/2004 | 1/5/2004 | P | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 12/30/2003 | 12/31/2003 | 12/31/2003 | P | CANC |
Troy Cobbley
|
|
|
contractor could not meet to provide the submittals 12/31/2003 2:35:59 PM
|
INSP-Final Inspection | 12/30/2003 | 12/30/2003 | 12/30/2003 | P | FAIL |
Troy Cobbley
|
|
|
Darren; Phone #: ###-#### The hood suppression system operated correctly but the contractor did not have the submittals 12/30/2003 3:18:17 PM
|