Permit Number | FIR03-00772 |
Status | Finaled |
Name |
MICRON TECHNOLOGY INC FP
|
Site Address |
8000 S FEDERAL WAY
|
Project Name | SPR MICRON 24B FAB 4 YE/YA |
Customer Number | PCS5786 |
ePlanReview | |
Description |
Micron Building #24B - Remodel the Fab 4 YE/YA Centuras/Endura Install * This work is being done on the first and second floor of building #24B between grid lines 11&14 and G&H. The fire sprinkler modifications is the result of the demolishing and removal of some existing partitions and the installation of some new partitions at the existing Fab 4, Y.E. Lab area 117A, for the conversion into a new Metals 3 Plenum Area 114Q and a Metals Bay 4 Area 117A. Work is also related to the demolition and relocation of the flooring, ceiling grid, lighting and mechanical in the first and second floor areas. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02314.
|