INSP-Final Inspection | 12/16/2004 | 12/16/2004 | 12/16/2004 | A | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | PART |
Rick Jackson
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Hydro and r/i of hose valves and warehouse B okay 12/9/2004 4:18:22 PM
|
INSP-Alarm Testing | 8/5/2004 | 8/5/2004 | 8/5/2004 | P | PASS |
Rick Jackson
|
|
|
Tested the flows/tampers - tested okay - bldg A is now supervised by the monitoring company; bldg B is not sprinklered at this time; need to forward flow backflow need blue tags on glycol and wet risers; calc stickers; need locks on wall PIV's for both buildings 8/5/2004 3:10:46 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2004 | 8/4/2004 | 8/4/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/3/2004 at 7:47:57 AM. Contact: ###-####. The 6 inch main from riser to bldg A has been completed - bldg A has charged system; will test flows/tamper on 8/5; UG requires hydro or provide proof it has been completed; all pipe/riser in bldg B will need hydro 8/4/2004 3:22:15 PM 8/4/2004 3:23:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/16/2004 | 4/16/2004 | 4/16/2004 | P | PART |
Rick Jackson
|
|
|
office; Phone #: ###-#### Internet Inspection Request from: Darla Downs Racking hydro okay 4/16/2004 11:40:08 AM
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2004 | 4/15/2004 | 4/15/2004 | P | FAIL |
Rick Jackson
|
|
|
pager #///jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore racking system dropped 5 psi; overhead and canopy system hydro okay 4/15/2004 12:47:33 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/14/2004 | 4/14/2004 | 4/14/2004 | P | FAIL |
Rick Jackson
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs Need trapeze and EQ completed at south of wall between building A and B; couldn't do hydro as weld has failed 4/14/2004 2:20:18 PM
|
INSP-Supply line flush | 3/12/2004 | 3/12/2004 | 3/12/2004 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number. See fir03-00667 3/12/2004 1:44:31 PM
|
INSP-Sprinkler Rough-in | 1/27/2004 | 1/27/2004 | 1/27/2004 | P | PART |
Troy Cobbley
|
|
|
Fire sprinkler piping in the office area is OK for cover per the resubmitted plans approved on 1/27/04 1/27/2004 3:19:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2004 | 1/27/2004 | 1/27/2004 | A | FAIL |
Troy Cobbley
|
|
|
Plans do not match the installed piping for layout or for pipe size. Sidewall head, on east side, in lobby needs to be extended coverage. Resubmitt plans 1/27/2004 10:11:15 AM
|