INSP-Final Inspection | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/3/2005 | 11/8/2005 | 11/8/2005 | A | CANC |
Troy Cobbley
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa cancel cambry
|
INSP-Final Inspection | 11/3/2005 | 11/4/2005 | 11/4/2005 | A | FAIL |
Troy Cobbley
|
|
|
See review note #2 requiring verification of spacing over 148 sq.ft. This applies to the pendant heads in the two north side conference rooms.
|
INSP-Final Inspection | 10/31/2005 | 10/31/2005 | 10/31/2005 | P | NR |
Troy Cobbley
|
|
|
I left a correction notice with Diane at the front desk that if all permits had not been finaled by 11/11/05 the affected areas of the building would be shutdown. I also spoke to scott, the building owner. See building review comments.
|
FIR-Aging Inspection | 7/28/2005 | 7/28/2005 | 8/1/2005 | | NR |
Troy Cobbley
|
|
|
Jim Danes is not sure that the work has been done. He will verify.
|
INSP-Conference | 5/26/2005 | 5/26/2005 | 5/26/2005 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Jim with DeBest about job status. He said he would follow up.
|
FIR-Aging Inspection | 4/6/2004 | 4/6/2004 | 4/6/2004 | | NR |
Troy Cobbley
|
|
|
work in progress 4/6/2004 8:19:09 AM
|
FIR-Aging Inspection | 4/6/2004 | 4/6/2004 | 4/6/2004 | | NR |
Troy Cobbley
|
|
|
work in progress 4/6/2004 8:19:09 AM
|
INSP-Conference | 8/17/2005 | 9/6/2005 | | P | |
Troy Cobbley
|
|
|
Follow up for inspection
|