Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00051
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 249 N 9TH ST
Project NameSPR TELCO FEDERAL C.U.
Customer Number 
ePlanReview 
Description
(BOISE TELCO FEDERAL CREDIT UNION - SEDGWICK CENTER - 1ST FLR) To modify fire sprinklers by relocating 6 and plugging 2 for the remodel of an existing 1,510-ft/2 tenant space located on the first floor of a high-rise building. The new tenant is a credit union. Work is related to new interior walls and ceilings. This building is fire sprinklered because it is a high-rise. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02919.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/20/20042/20/20042/20/2004PPASS
DetailsRick Jackson
INSP-Final Inspection1/30/20042/2/20042/2/2004APASS
DetailsRick Jackson
adam; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie okay to cover; need to verify annual inspection of sprinkler system at final 2/2/2004 10:21:40 AM