(CALVARY CHAPEL - ELEMENTARY SCHOOL BUILDING) To install a complete fire sprinkler system in an existing 2 story, 6,584-ft/2 church being converted into an elementary school. The 1st floor has a floor area of 3,340-ft/2 and the 2nd floor has a floor area of 3,244ft/2. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. This building is fire sprinklered for story increase and to allow both 2nd floor stairways to be open. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02402.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/23/20044/23/20044/23/2004APASS
DetailsTroy Cobbley
Fire sprinklers finaled
INSP-Final Inspection4/19/20044/20/20044/20/2004PFAIL
DetailsTroy Cobbley
Provide spare heads in cabinet, chain and lock PIV, tag riser, provide NFPA 25 and test certificates 4/20/2004 4:09:39 PM
INSP-Sprinkler Rough-in/Hydro4/14/20044/15/20044/15/2004PPASS
DetailsTroy Cobbley
above ground and supply line hydro test is OK. Need forward flush and alarm test 4/15/2004 4:19:34 PM
INSP-Final Inspection4/12/20044/13/20044/13/2004ACANC
DetailsTroy Cobbley
not ready 4/13/2004 11:32:11 AM
INSP-Sprinkler Rough-in4/8/20044/8/20044/8/2004PPART
DetailsTroy Cobbley
sprinkler piping is ok to cover on the first floor but earth quake bracing still needs to be done. See plans for locations where upright heads are over spaced 4/8/2004 12:17:50 PM
INSP-Sprinkler Rough-in4/6/20044/6/20044/6/2004PPART
DetailsTroy Cobbley
2nd floor sprinkler rough-in is ok. Add earth quake bracing to main 10/15/2003 11:36:41 PM
INSP-Sprinkler Rough-in3/15/20043/15/20043/15/2004PPART
DetailsTroy Cobbley
Sprinklers under stairs are ok to cover 3/15/2004 2:51:44 PM
INSP-Supply line flush3/10/20043/11/20043/11/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/10/2004 at 10:47:37 AM. Contact: ###-####. UG flush okay 3/11/2004 10:49:22 AM
INSP-Sprinkler Rough-in3/5/20043/5/20043/5/2004PPART
DetailsTroy Cobbley
Underground supply line is ok to cover 3/5/2004 3:03:33 PM