Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR04-00130
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameSPR ST. LUKES E. TWR, SUBBASE
Customer Number 
ePlanReview 
Description
(ST LUKES-EAST-SUBBASEMENT)(CENTRAL PROCESSING SUITE) To install fire sprinkler protection and modifications to existing system comply with Light Hazard Occupancy Use in the finish out of approximately 12,600-ft/2 area for office, sterilization. Processing and storage is also being installed and will require OH-1 minimum protection. Fire sprinkler work will includes selective demolition within the new office area and build-out and finish of sterilization & storage area of sub-basement shell & core. Fire sprinkler work is related to the construction of interior non -bearing, non-combustible walls to create the exit path between stair enclosures; create decontamination, processing, terminal sterilization, packaging, breakdown, storage and support administrative areas. To install suspended ceiling grid system. To the Existing 2-hour fire wall between the East Tower and the East Tower Annex shall be maintained. NOTE: The elevator lifts serving this floor and the basement above are part of BLD03-02465, and connected Fire permit FIR04-00081, ETA Surgery Suite permits. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02878.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/26/20051/26/20051/26/2005APASS
DetailsRick Jackson
INSP-Sprinkler Rough-in/Hydro1/12/20051/13/20051/13/2005APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 1/12/2005 at 12:46:54 PM. Okay to cover breakdown aeas and locker rooms; breakdown modified from plans but spacing/coverage maintained; will close this out at building final 1/13/2005 10:04:04 AM
INSP-Conference10/14/200410/14/200410/14/2004APART
DetailsRick Jackson
Hi Rick, I would like you and Dave H. to look over that maybe problem at the cart wash so we can come up with a fix. Thanks Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble A shroud will be attached to the equipment and the grid tied to it; will verify spacing when completed 10/14/2004 4:15:17 PM
INSP-Conference6/17/20046/17/20046/17/2004APART
DetailsRick Jackson
Good morning Rick I would like you to walk through the project to see if it's to your satisfaction it's going fast and I don't want you to miss anything thanks PHIL; Phone #: ###-#### Internet Inspection Request from: Phil Doble Met with Phil about procedures for approval for covering hard lid areas; will mark on plans in his office that are approved 6/17/2004 10:43:20 AM
FIR-Aging Inspection6/11/20046/11/20046/11/2004 PASS
DetailsRick Jackson
Work is still in progress 6/11/2004 7:17:45 AM