Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR04-00174
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2895 S FEDERAL WAY
Project NameSPR OH STONE MOUNTAIN FLOORING
Customer Number 
ePlanReview 
Description
Stone Mountain Flooring - To install a complete (including inrack), wet pipe fire protection system in a new 35,675-ft/2, two story, concrete tilt-up structure, of which includes the 21,045-ft/2, two story tenant improvement for Stone Mountain Flooring consisting of OH-2 (miscellaneous mercantile) and High Rack storage protection for Group "A" Plastics. The remaining future T.I. spaces will include a retail/warehouse area, shipping and receiving area and a second floor office support area. All construction per the approve plans and attached comment list. Separate tenant improvement permits will be required to finish this building for occupancy outside of what is addressed in this scope of work. All fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02057 which is a "Shell" permit, but also represents work related to BLD03-03054, the Stone Mountain Flooring T.I. permit. The underground fire service supply is installed under FIR03-00814.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/31/20048/31/20048/31/2004APASS
DetailsRick Jackson
INSP-Final Inspection8/27/20048/27/20048/27/2004PFAIL
DetailsRick Jackson
Your contact is Mike Bierman at ###-####; Phone #: ###-#### Internet Inspection Request from: Trent Bice Need clac sticker 8/27/2004 4:10:53 PM
INSP-Sprinkler Rough-in7/12/20047/13/20047/13/2004PPART
DetailsRick Jackson
This is a rough to cover.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Okay to cover; high temp heads at unit heaters; heads under overhead doors in progress; need SR head in elevator machine room; need UG resubmittals at job site; racks not installed 7/13/2004 2:06:36 PM
INSP-Sprinkler Rough-in/Hydro7/6/20047/6/20047/6/2004PCANC
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Trent Bice Wrong permit called as this was for the UG hydro - see FIR03-00814 7/6/2004 12:33:22 PM
INSP-Sprinkler Rough-in/Hydro6/22/20046/23/20046/23/2004PNR
DetailsRick Jackson
Johnathon -- please call first; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Will reschedule for overhead hydro 6/23/2004 2:00:30 PM
INSP-Sprinkler Rough-in/Hydro6/7/20046/8/20046/8/2004AFAIL
DetailsRick Jackson
###-#### mike See plans for areas that need corections: heads overspaced; straps and hangers; need standard response head in elevator machine room; need 286 heads within 7 ft of unot heaters; overspaced at "future stair" on west side of building 6/8/2004 10:15:24 AM