INSP-Final Inspection | 8/4/2004 | 8/5/2004 | 8/5/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 3:37:17 PM. Contact: ###-####.
|
INSP-Final Inspection | 7/15/2004 | 7/22/2004 | 7/22/2004 | A | FAIL |
Rick Jackson
|
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Panel in trouble from NAC panel; smoke detectors overspaced - see plans; need lockout on NAC panel breaker; remove local alarm signs at manual pulls 7/22/2004 10:51:19 AM
|
INSP-Final Inspection | 7/7/2004 | 7/9/2004 | 7/9/2004 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/7/2004 at 10:55:51 AM. Contact: ###-####. Talked to Brian and electrician and this will be rescheduled when the new service counter fire doors are installed; need to verify fire door release 7/9/2004 10:42:17 AM
|
FIR-Aging Inspection | 7/7/2004 | 7/7/2004 | 7/7/2004 | | PASS |
Rick Jackson
|
|
|
Talked to Peter and this will be ready for inspection within the next few days 7/7/2004 9:56:55 AM
|