INSP-Final Inspection | 6/22/2004 | 6/22/2004 | 6/22/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler permit finaled
|
INSP-Final Inspection | 5/7/2004 | 5/7/2004 | 5/7/2004 | P | FAIL |
Troy Cobbley
|
|
|
Insulation is still falling from the deck and blocking upright sprinkler heads
|
INSP-Final Inspection | 4/28/2004 | 4/28/2004 | 4/28/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide canopies on the sprinkler pendants. Insulation is still blocking sprinkler upright coverage in three locations. Provide annual inspection for the existing sprinkler system.
|
INSP-Final Inspection | 4/22/2004 | 4/23/2004 | 4/23/2004 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for covering of the sprinkler piping not a final. Sprinkler piping is ok to cover but insulation is still falling from the deck and blocking some of the sprinkler heads. Contractor can install ceiling tile. Insulation repair will be spot checked later. The existing fire alarm monitoring system has been disabled. I contacted the owner of the strip mall (Mike) and gave him until Monday 4-26-04 to repair the system. 4/23/2004 12:35:17 PM
|
INSP-Final Inspection | 4/20/2004 | 4/21/2004 | 4/21/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide the minimum 1" clearance between the upright deflector and the insulation, provide earthquake bracing on the existing sprinkler mains, pendants in the center of the retail space are overspaced. This inspection was for the retail space only. 4/21/2004 3:39:14 PM
|