Permit Number | FIR04-00240 |
Status | Finaled |
Name |
FUTURETECH
|
Site Address |
251 E FRONT ST
|
Project Name | alm - Perkins Coie -4TH FLR |
Customer Number | |
ePlanReview | |
Description |
To provide notification and HVAC shutdown in the tenant improvement area to an existing sprinkler monitoring fire alarm system.
The associated building permit (BLD 03-00025) is to construct a 3,944 sq.ft. expansion to an existing office space located on the fourth floor per approved plans. Work to include, construction of interior partitions, installation of suspended ceiling, new lighting, new HVAC system, installation of counters and cabinets, new break room sink, miscellaneous related interior finishes. Restrooms and exit access rated corridor system are existing and were constructed under the core and shell permit, this building is fully fire sprinklered for one-hour fire resistive substitution, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#007-04) RMH / PLAN MODIFICATION 4/08/04, PLANS HAVE BEEN MODIFIED TO ADD A WALL AND DOOR BETWEEN OFFICE AREAS THAT MAY BE SUBLEASED, ADDED EXIT DOOR TO FILE ROOM SO THAT TRAVEL DISTANCE MAY BE MAINTAINED AND THAT BOTH OFFICES WILL HAVE INDEPENDENT EXITS, ADDED NEW RECEPTION AREA TO OFFICE, THERE WILL BE ONLY ONE CERTIFICATE OF OCCUPANCY ISSUED. (RMH) (PERKINS COIE LLP)(ONE FRONT STREET-SUITE 400)
|