Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR04-00246
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMicron Building 2
Customer Number 
ePlanReview 
Description
Micron Building #2 - F1 Remodel TA1 YA Relocate Hood & Etch * (PCS#20036165) To relocated 7 existing and add 1-Viking Model "Microfast", Q.R., SSP, 5.6 K-factor, (½"), VK302 on the 1st floor and relocate 5 existing and add 1-Viking Model "Microfast", Q.R., SSP, 5.6 K-factor, (½"), VK302. This work is related to the demolition and removal of existing restrooms and stairway in bldg. #2 on first and second floor (1st fl. 735 ft/2 area, 2nd fl. 635ft/2 area) and the remodel of the first floor to convert the restroom and stairway areas to a new Yield Analysis Prep Lab #105A. To remodel the second floor restroom area to a new YA Electrical Test area, to infill the second floor stair area, new suspended ceiling system. This work is being done in Building #2 between grid lines A&B and 11&12 on the 1st and 2nd floors. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02893.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/21/20045/24/20045/24/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/21/2004 at 11:27:29 AM. Contact: ###-####.
INSP-Final Inspection5/13/20045/14/20045/14/2004AFAIL
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Wayne Berry Overspaced on second floor and two heads are within 6 ft of each other 5/14/2004 1:49:16 PM