INSP-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler permit finaled
|
INSP-Final Inspection | 7/30/2004 | 8/2/2004 | 8/2/2004 | P | PART |
Rick Jackson
|
|
|
Contact: Brian ; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Okay to cover; will close out this permit at building final - need escutcheons and sprinkler is overdue annual inspection 8/2/2004 2:53:10 PM
|
INSP-Final Inspection | 7/20/2004 | 7/21/2004 | 7/21/2004 | P | FAIL |
Troy Cobbley
|
|
|
Upright sprinkler heads are overspaced in atleast three locations. See plans. Two pendant sprinkler heads are less than 6' apart. See plans. Atleast one armover exceeds 2'. See plans. Inspection was stopped and no other items looked at. These items appear to be existing conditions. Scope of work for the building permit encompasses the entire building therefore the entire sprinkler system shall meet code. Resubmitt plans showing all sprinkler piping, sizing and sprinkler head locations. Show modifications required to meet code. Do not install any more ceiling tile. 7/21/2004 3:35:13 PM
|
INSP-Sprinkler Rough-in | 6/16/2004 | 6/17/2004 | 6/17/2004 | A | PART |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover in procedure areas (two) and the two restrooms. See approved plans for areas. 6/17/2004 2:01:46 PM
|