Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR04-00271
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 1700
Project NameSPR US BANK-17TH FLR
Customer Number 
ePlanReview 
Description
(DELOITTE & TOUCHE - US BANK - SUITE 1700) To change out the entire 105 sprinklers of an existing high-rise building, while relocating 97 and adding 12 for the remodel of the entire 14,520-ft/2 17th floor. This tenant space has a floor area of about 11,857-ft/2. The core (restrooms, elevators, stairways, corridor, etc.) has an area of about 2,663-ft/2. The tenant will occupy the entire floor. Fire sprinkler work is also related to interior nonbearing walls and suspended ceilings. This building is fire sprinklered because it is a high-rise. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 17th floor are regulated under the provisions of the 2000 IBC. This fire protection work shall comply with the IFC 2000 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD03-02941.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/15/20047/15/20047/15/2004PPASS
DetailsRick Jackson
INSP-Final Inspection7/13/20047/13/20047/13/2004PPASS
DetailsRick Jackson
kerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Will final this at the building /fire life safety final to verify spare heads are provided 7/13/2004 4:06:33 PM
INSP-Sprinkler Rough-in/Hydro6/28/20046/30/20046/30/2004AFAIL
DetailsTroy Cobbley
See city approved plans for locations that are ok to cover. Also see city approved plans for areas that need corrections. Contractor still needs to submitt as-builts for changes in piping and head layout. 6/30/2004 9:53:20 AM
INSP-Sprinkler Rough-in/Hydro5/21/20045/21/20045/21/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/21/2004 at 9:54:38 AM. Contact: ###-####. Okay to cover hard lids only; many changes made to piping; will require as-builts 5/21/2004 2:32:33 PM