INSP-Sprinkler Rough-in/Hydro | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 3:16:20 PM. Contact: ###-####. Final okay; EC sidewall installed at counter 12/7/2004 3:29:39 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 9:37:31 AM. Contact: ###-####. There is lack of coverage between the glass and the fire shutter at the service counter - the space is 1.5 ft by 15 ft. 11/29/2004 3:46:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 8:04:22 AM. Contact: ###-####. Overspaced (see plans); this area is not completed; overspaced at temp wall 8/6/2004 2:51:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2004 | 6/17/2004 | 6/17/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/17/2004 at 10:32:17 AM. Contact: ###-####. See pans for eras approved; one head was deleted per plans in storage room but is under 130 sq ft 6/17/2004 2:15:33 PM
|