INSP-Final Inspection | 3/8/2005 | 3/8/2005 | 3/8/2005 | P | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled 3/8/2005 2:51:19 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | PASS |
Troy Cobbley
|
|
|
Club house hydro test passed. For final we need to test the alarm interconnections and I need test papers 2/24/2005 11:17:02 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/16/2005 | 2/17/2005 | 2/17/2005 | P | PART |
Troy Cobbley
|
|
|
Club house hydro test failed. 24 hour air test passed. 2/17/2005 3:20:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | DONE |
Troy Cobbley
|
|
|
Did walk through for all floors and started 24 hour air test at 1:00 for both dry systems
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PASS |
Troy Cobbley
|
|
|
Concealed pockets ok to cover 12/20/2004 2:08:06 PM
|
INSP-Conference | 12/10/2004 | 12/13/2004 | 12/13/2004 | A | PASS |
Troy Cobbley
|
|
|
Tenting for the sprinkler piping in the clubhouse/pool area is ok to cover. Still need cover inspection for the combustible concealed spaces that will be filled with insulation. 12/13/2004 11:47:23 AM
|
INSP-Sprinkler Rough-in | 11/30/2004 | 12/1/2004 | 12/1/2004 | A | PASS |
Troy Cobbley
|
|
|
Fourth floor is ok to cover. Letter has been provided by the engineer. Rough-in on the club house is ok. Before sprinkler piping can be covered in the clubhouse a tenting inspection and combustilbe concealed spaces need to be filled with insulation. 12/1/2004 10:03:40 AM
|
INSP-Conference | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | DONE |
Troy Cobbley
|
|
|
I did a tenting inspection for jack on the fourth floor. I found three locations where piping did not have tenting. Jack will fix. Still does not have letter from structural engineer so no approval for cover given. 11/29/2004 4:03:15 PM
|
INSP-Sprinkler Rough-in | 11/22/2004 | 11/23/2004 | 11/23/2004 | A | FAIL |
Troy Cobbley
|
|
|
Tenting still is not done correctly. Still need the letter from the engineer 11/23/2004 11:03:06 AM
|
INSP-Sprinkler Rough-in | 11/17/2004 | 11/18/2004 | 11/18/2004 | A | FAIL |
Troy Cobbley
|
|
|
Eric; Phone #: ###-#### Inspection was for corrections and tenting on the fourth floor . Corrections are ok but the tenting needs repaired in many locations. I also did rough-in spection for the club house. Uprights are too far from deck in some locations. Branchline over pool appears to exceed 12" from centerline of peak. Hangers are not to top chord. See approved plans for locations of problems. Still need letter from engineer before cover on fourth floor will be given. 11/18/2004 10:14:41 AM
|
INSP-Sprinkler Rough-in | 11/15/2004 | 11/16/2004 | 11/16/2004 | P | PART |
Troy Cobbley
|
|
|
Hydro test for 1st-4th floors plus the dry system is ok. See plans for piping in an overbuild that is too far from deck. Need tenting inspection and letter from structural engineer. Club house has not been tested or inspected. 11/16/2004 3:19:32 PM
|
INSP-Sprinkler Rough-in | 10/18/2004 | 10/20/2004 | 10/20/2004 | A | FAIL |
Rick Jackson
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Gatehouse area: Hangers and EQ bracing on webbing - move to top chord or provide written engineeering approval 10/20/2004 10:40:46 AM
|
INSP-Sprinkler Rough-in | 10/1/2004 | 10/1/2004 | 10/1/2004 | P | PASS |
Troy Cobbley
|
|
|
second and third floor sprinkler piping is ok to cover. Contractor still needs to provide engineering ok for support of piping on the bottom chords. I notified eric with treasure valley fire that piping will need to go to top chord and all ceilings removed if verification is not provided. 9/1/2004 3:52:17 PM
|
INSP-Sprinkler Rough-in | 9/23/2004 | 9/23/2004 | 9/23/2004 | P | PART |
Troy Cobbley
|
|
|
1st floor rooms are ok to cover except for the room next to the elevators where the 4" dry piping transitions to 6". Piping does not match plans here. Also the entries at the north and the west need holes patched and insulation installed before cover 9/23/2004 2:47:42 PM
|
INSP-Sprinkler Rough-in | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | FAIL |
Troy Cobbley
|
|
|
I inspected the first floor area west of the elevator and found hangers that have not been corrected yet, combustible space with no upright protection and earth quake bracing missing. See approved plans for exact locations. 9/22/2004 2:51:44 PM
|
INSP-Sprinkler Rough-in | 9/21/2004 | 9/21/2004 | 9/21/2004 | P | DONE |
Troy Cobbley
|
|
|
This was actually a conference with Eric who is the installer. Bill Alexander and I went over the items on my correction notice and explained the sections in the NFPA 13 that were referenced on the correction notice 9/21/2004 3:46:39 PM
|
INSP-Sprinkler Rough-in | 9/16/2004 | 9/16/2004 | 9/16/2004 | P | FAIL |
Troy Cobbley
|
|
|
Sprinkler uprights in many locations do not meet spacing requirements of nfpa 13-8.6.5.2.1.6 or 8.6.5.2.1.7 (Also see exhibit 8.18). Sprinkler uprights bocked in many locations by round duct. See nfpa 13-8.6.5.2.1.3. Provide verification sprinkler piping can be attached to the top of the bottom chord of the trusses. See nfpa 13-9.2.1.3.1. Per plans wood screws are shown to be used on the pipe straps. Lag screws have been used instead. Nfpa 13-9.1.5.3.3 requires all holes to be predrelled. Provide verification this has been done. Fire sprinkle contractor has used nails and screws (construction debris) in the gaps between the pipe strap hanger and the pipe it is supposed to hold. This appears to have been done to get a correct fit instead of tightening down the lag screws. Hangers must be listed. See nfpa 13-9.1.1.4.1. Side sammys have been screwed into the 1 3/4" side of the top chord of the trusses to hang the 2 1/2" main. This does not meet nfpa 13-9.1.5.6.1. This inspection was stopped at this point. No other items except those listed specifically above have been looked at. All of the items found are in a very small portion of the project on the first floor. No other areas inspected. All items listed above are addressed in the review notes but plans are being kept in the job shack. Do not cover piping until re-inspection passes. It also appears resubmittals are required on notes #1, #2 and #5 of the plan review. 9/16/2004 1:35:57 PM
|