INSP-Final Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 9/26/2005 | 10/3/2005 | 10/3/2005 | A | CANC |
Troy Cobbley
|
|
|
Follow up inspection for rag tag of hood
|
INSP-Conference | 9/13/2005 | 9/19/2005 | 9/26/2005 | P | DONE |
Troy Cobbley
|
|
|
I left a notice with Judy stating: This permit was failed on 9/22/04. I have followed up twice with the contractor about completing the permit. Once on 8/16/05 and the other on 9/13/05. No action has been taken so far. Owner is being given until October 3, 05 to have permit finaled. If permit is not finaled the hood will be red tagged for shutdown and no cooking will be allowed until the permit has been finaled. A follow up inspection has been scheduled.
|
INSP-Conference | 8/16/2005 | 9/7/2005 | 9/13/2005 | P | FAIL |
Troy Cobbley
|
|
|
Don says the project is complete and it will be called in on Friday or Monday
|
FIR-Aging Inspection | 8/12/2005 | 8/12/2005 | 8/16/2005 | | NR |
Troy Cobbley
|
|
|
I spoke to Don and he will follow up
|
INSP-Final Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | FAIL |
Troy Cobbley
|
|
|
The electrical appliances under the large hood did not shut down and holes in the hood need pluged 9/22/2004 3:31:03 PM
|