Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR04-00539
StatusFinaled
Name SYNERGY ENGINEERS
Site Address 6140 W CURTISIAN AVE Unit: 101
Project Namealm - ST AL'S MOB #6
Customer Number 
ePlanReview 
Description
To provide manual pull stations, smoke duct detectors (HVAC shutdown) and notification throughout a new tenant improvement on the first floor of the MOB #6. A new NAC extender panel is being installed to accommodate the additional notification appliances. The required sprinkler monitoring fire alarm system includes manual pull stations, HVAC shutdown, fire/smoke damper control, elevator recall/shutdown and notification throughout.

The associated building permit (BLD 04-01268) is to include new interior walls, new interior doors and windows, interior finish, new suspended ceiling, fire sprinkler and alarm work, new plumbing, new mechanical, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered and has an alarm system. (PC#0375-04) JCB- (BOISE SURGICAL GROUP)(ST ALPHONSUS MOB #6-STE 101) New 6,207 sq. ft. medical office tenant in the north end of the first floor in existing vacant shell building space per approved plans on file.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/10/200411/10/200411/10/2004PPASS
DetailsTroy Cobbley
Fire alarms finaled
INSP-Final Inspection11/9/200411/9/200411/9/2004AFAIL
DetailsTroy Cobbley
Supervisory signals did not go out. Need map 11/9/2004 2:41:34 PM