Permit Number | FIR04-00539 |
Status | Finaled |
Name |
SYNERGY ENGINEERS
|
Site Address |
6140 W CURTISIAN AVE Unit: 101
|
Project Name | alm - ST AL'S MOB #6 |
Customer Number | |
ePlanReview | |
Description |
To provide manual pull stations, smoke duct detectors (HVAC shutdown) and notification throughout a new tenant improvement on the first floor of the MOB #6. A new NAC extender panel is being installed to accommodate the additional notification appliances. The required sprinkler monitoring fire alarm system includes manual pull stations, HVAC shutdown, fire/smoke damper control, elevator recall/shutdown and notification throughout.
The associated building permit (BLD 04-01268) is to include new interior walls, new interior doors and windows, interior finish, new suspended ceiling, fire sprinkler and alarm work, new plumbing, new mechanical, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered and has an alarm system. (PC#0375-04) JCB- (BOISE SURGICAL GROUP)(ST ALPHONSUS MOB #6-STE 101) New 6,207 sq. ft. medical office tenant in the north end of the first floor in existing vacant shell building space per approved plans on file.
|