Permit Number | FIR04-00577 |
Status | Finaled |
Name |
IDAHO FIRE PROTECTION
|
Site Address |
300 E MALLARD DR Unit: 145
|
Project Name | SPR PROGRESSIVE SOFTWARE |
Customer Number | |
ePlanReview | |
Description |
(PROGRESSIVE SOFTWARE SOLUTIONS) (SUITE 145) To add one fire sprinkler head in a 674-ft/2 tenant space use is to be an office. Fire sprinkler work is related to overspacing of the office corridor. This building is sprinklered for one-hour substitution. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to MIS04-00080.
|