INSP-Final Inspection | 1/13/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Troy Cobbley
|
|
|
People and furnishings have left basement
|
INSP-Final Inspection | 12/10/2004 | 12/14/2004 | 12/14/2004 | A | FAIL |
Troy Cobbley
|
|
|
There appears to be people living in the basement. Plans submitted and approved do not address a residential occupancy. Resubmit plans addressing a residential occupancy. 12/14/2004 12:16:29 PM
|
INSP-Final Inspection | 11/30/2004 | 12/1/2004 | 12/1/2004 | A | CANC |
Troy Cobbley
|
|
|
Rescheduled for this afternoon 12/1/2004 9:59:03 AM
|
INSP-Sprinkler Rough-in/Hydro | 12/1/2004 | 12/1/2004 | 12/1/2004 | P | FAIL |
Troy Cobbley
|
|
|
Plans show one nac circuit installed on the first floor but there are actually two. Resubmit plans showing the asbuilt layout. Provide an a/v in the common restroom next to classroom #5. This restroom is not shown on the plans. 12/1/2004 2:13:26 PM
|