INSP-Final Inspection | 12/23/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/23/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 12/23/2010 | 12/23/2010 | 12/23/2010 | | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 10/14/2010 | 10/14/2010 | 10/20/2010 | | DONE |
Troy Cobbley
|
|
|
I spoke to Greg Jackson, the branch manager for Consolidated Supply, about the pressure switch requirement for the dry pipe valve.
|
INSP-Final Inspection | 7/12/2010 | 7/12/2010 | 7/14/2010 | P | FAIL |
Troy Cobbley
|
|
|
The duct smoke detector was mounted incorrectly so it was not tested. The missing high/low pressure switch will be handled by prevention. If not included on this permit as an as-built a separate permit will be required when it is added to the existing fire alarm system.
|
INSP-Final Inspection | 7/9/2010 | 7/12/2010 | 7/12/2010 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Final Inspection | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | CANC |
Troy Cobbley
|
|
|
to be rescheduled
|
INSP-Conference | 6/16/2010 | 7/6/2010 | 7/6/2010 | A | DONE |
Troy Cobbley
|
|
|
Per Bill this will be called in within the next day or two.
|
INSP-Final Inspection | 6/23/2010 | 6/24/2010 | 6/25/2010 | A | FAIL |
Forrest France
|
|
|
Re-inspection for correction items dated 2/7/05. Items still not repaired include; provide high/low air pressure switch monitoring, map at the FACP, signage at the riser door, battery trouble did not report. Items retested okay include sprinkler waterflow and phone line 2. Noted one duct detector has been installed and NFPA 72 forms were on site.
|
INSP-Sprinkler Rough-in/Hydro | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | CANC |
Forrest France
|
|
|
Incorrect inspection type request.
|
INSP-Conference | 6/10/2010 | 6/15/2010 | 6/16/2010 | A | DONE |
Troy Cobbley
|
|
|
I spoke to Greg Jackson, the branch manager, for Consolidated Supply about the need to get this permit finaled. He placed a phone call to Bill at Alarmco. I was handed the phone and Bill stated that he would have a tech out there tomorrow and hopefully an inspection called in for Friday. A follow up inspection has been scheduled.
|
INSP-Conference | 6/3/2010 | 6/10/2010 | 6/10/2010 | A | DONE |
Troy Cobbley
|
|
|
Bill has not been able to sent a tech out yet. He will try again. Follow up inspection set up for next week.
|
FIR-Aging Inspection | 6/2/2010 | 6/2/2010 | 6/3/2010 | | NR |
Troy Cobbley
|
|
|
Per Lorie a tech is being sent out to check project status. I will be notified within the next day or two. A follow up inspection has been scheduled for next week.
|
FIR-Aging Inspection | 3/18/2010 | 3/18/2010 | 3/24/2010 | | NR |
Troy Cobbley
|
|
|
Permit information forwarded to Stephanie and to Scott for further action.
|
INSP-Final Inspection | 2/4/2005 | 2/7/2005 | 2/7/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification duct smoke detectors are not required. Provide high/low pressure switch monitoring. Test waterflow. Provide map at facp. Not receiving phone line 2 trouble or the battery troubles. Provide signage for the riser door. Provide nfpa 72 forms 2/7/2005 11:37:06 AM
|
FIR-Aging Inspection | 2/1/2005 | 2/1/2005 | 2/1/2005 | | NR |
Troy Cobbley
|
|
|
Per Terri they are waiting for the knox key box to be installed and then will call in the final. 2/2/2005 3:45:09 PM
|