INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | PART |
Troy Cobbley
|
|
|
All piping was hydro tested and passed up to the new backflow preventor for the outside canopy . As far as the roughin, contractor needs to address deficiencies on the existing sprinkler piping such as lack of earthquake bracing, retaining straps and top beam clamps not attached to the top of the trusses.
|
INSP-Sprinkler Rough-in/Hydro | 7/6/2005 | 7/7/2005 | 7/7/2005 | P | CANC |
Troy Cobbley
|
|
|
Contractor not ready
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2005 | 7/7/2005 | 7/6/2005 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 7/5/2005 at 4:23:47 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 6 2005 11:54AM.
|
FIR-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 | | NR |
Troy Cobbley
|
|
|
Project was on hold until general contractor returns at the first of April 3/30/2005 12:58:33 PM
|