Permit Information
Permit NumberFIR04-00745
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 1221 W IDAHO ST
Project Namealm - IDAHO POWER-6TH FLR
Customer Number 
ePlanReview 
Description
To provide complete notification and seven in-duct detectors 6/28/2005 - Eight (8) total area coverage smoke detectors for HVAC shutdown in the remodeled area on the west side of the 6th floor. A general note states that the any smoke detector shall shut down all HVAC on the entire floor. A smoke detector and speaker/strobe are being added to the electrical room for the NAC panel. A previously issued fire alarm permit (FIR04-00472) includes notification appliances in this open office area. The construction schedule is for FIR04-00472 to be completed prior to the initiation of this permit. The required manual fire alarm system (high-rise building requirements) includes sprinkler monitoring, required automatic detection, HVAC shutdown, fire/smoke damper control, door release and notification throughout.

5/4/2006 - Smoke detector will be installed in Office 609. That will accommodate the required full area coverage for this TI space.

The associated building permit (BLD 04-02236) is to remodel a 3240 sq ft portion of an 8299 sq ft office space located on the 6th floor for new office space. ONLY 3240 sq ft will be used, but this will be open to the whole floor area. ALL EXIT ACCESS DOORS MUST BE OPERABLE, Work to include, construction of noncombustible partitions to create a small conference room and office space the rest will be open office area. Installation of lights and modification to the HVAC System. Miscellaneous related interior finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. A separate permit will be required for sprinkler relocation and fire alarm installation. (pc#632-04) Rmh (Idaho Power)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/29/200612/4/200612/5/2006APASS
DetailsForrest France
Items on previous c/n have been verified for completion, final alarm inspection passed.
INSP-Final Inspection10/13/200610/16/200610/17/2006PFAIL
DetailsForrest France
SD are overspaced in the west open area as marked on approved plans, one strobe in a north office as marked on plans is non-functional.
FIR-Aging Inspection3/9/20053/9/20053/9/2005 NR
DetailsTroy Cobbley
Per Chris this project is on hold due to design concerns on the fire alarm. Kathy Horton with Idaho Power is the contact. 3/9/2005 10:02:12 AM