Permit NumberFIR05-00152
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 495 S CAPITOL BLVD
Project NameBODO BLDG # 8 - SPR UG HAMPTON
Customer Number 
ePlanReview 
Description
*BODO Building #8 - Hampton Inns Hotel (Shell) - To install of 8" C-900 PVC fire service supply connected in Broad Street running approximately 230' south then approximate 8'-0" east into a new basement approximately 8"of finished wall with 8" Class 50 D.I. for the underground fire service supply of a new 235,965 square foot, eleven story high rise, concrete and steel framed retail, parking and hotel shell building, located in an undefined alley, to just north of bearing footing. This fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-02876.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/5/20072/5/20072/5/2007PPASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Sprinkler Rough-in/Hydro3/2/20063/3/20063/3/2006ADEFR
DetailsForrest France
Wrong permit number called in, was intended for a pump test on the overhead, noted that the sensing lines are incorrectly piped.
INSP-Sprinkler Rough-in/Hydro1/3/20061/4/20061/4/2006PPART
DetailsForrest France
Hydrostatic test for the UG fire supply line passed inspection.
INSP-Supply line flush12/30/20051/3/20061/3/2006PNR
DetailsForrest France
UG hydrostatic test not ready as the guage was below 200 psi at the begining of the test.
INSP-Sprinkler Rough-in/Hydro6/9/20056/9/20056/9/2005PPART
DetailsForrest France
The remainder of underground fire supply line is OK to cover.
INSP-Sprinkler Rough-in6/7/20056/7/20056/7/2005PPART
DetailsForrest France
Underground fire supply line OK for cover to last column line K northwest corner of hotel.
INSP-Sprinkler Rough-in6/6/20056/6/20056/6/2005PPART
DetailsForrest France
Underground fire supply line OK to cover up to point installed at 3rd column line from north side of hotel.
INSP-Sprinkler Rough-in/Hydro6/3/20056/3/20056/3/2005PPART
DetailsForrest France
Underground supply line OK to cover up to installed point just past vault.
INSP-Sprinkler Rough-in/Hydro6/1/20056/2/20056/2/2005APART
DetailsForrest France
The two lengths of 8'' C-900 installed from thrust block at stub in are OK to cover.
INSP-Sprinkler Rough-in/Hydro4/13/20054/13/20054/13/2005PPASS
DetailsForrest France
Underground stub-in OK to cover.