INSP-Sprinkler Rough-in/Hydro | 8/3/2005 | 8/3/2005 | 8/3/2005 | P | PART |
Forrest France
|
|
|
Overhead rough-in is acceptable to cover.
|
INSP-Final Inspection | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | PART |
Troy Cobbley
|
|
|
Dry pipe system under Concourse "B" passed. 57 seconds for trip time. Per Carl Westfall new code requirements do not require the fire proofing for separation just fire sprinklers.
|
INSP-Final Inspection | 6/27/2005 | 6/28/2005 | 6/28/2005 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the sprinkler modifications on the dry system under Concourse B. Need to replace/repair fire proofing affected by hangers and eq bracing, provide hydrostatic test papers and trip test the dry system. Hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2005 | 6/28/2005 | 6/28/2005 | P | PASS |
Troy Cobbley
|
|
|
This inspection was for the sprinkler modifications on the dry system under Concourse B. Need to replace/repair fire proofing affected by hangers and eq bracing, provide hydrostatic test papers and trip test the dry system. Hydro test passed.
|
INSP-Final Inspection | 8/30/2005 | 8/31/2005 | | A | |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 4:20:18 PM. Contact: ###-####.
|