Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00270
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2486 -2518 N BOGUS BASIN RD
Project NameSPR HIGHLANDS VILLAGE BLD 6
Customer Number 
ePlanReview 
Description
HIGHLANDS VILLAGE BLD #6 * 2486, 2486, 2516 & 2518 N. Bogus Basin Rd. To install approximately 109' of 4" C-900 PVC on the north and around the east side south, and up with a 4" D.I. riser piece to approximately 6" above concrete floor grade and to install overhead fire sprinkler protection throughout a new 13,266-ft/2 three story, four unit apartment building. The first floor is 4,346-ft/2 of which 2,912-ft/2 is for the garages (protected to Ordinary Group design) and the remaining is common area, (Light Hazard design). The second floor is 4,440-ft/2 and the third floor is 4,440-ft/2. These residential floors will be protected with a 13R design. Each unit on the second and third floors are single story units. This building is fire sprinklered per NFPA 13R for story increase. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work. This permit is attached to building permit: BLD04-00941.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/21/20075/22/20075/22/2007PPASS
DetailsForrest France
Fire sprinkler permit passed final inspection.
INSP-Sprinkler Rough-in/Hydro5/3/20075/4/20075/4/2007APART
DetailsForrest France
AG hydrostatic testing completed satisfactory.
INSP-Sprinkler Rough-in/Hydro5/3/20075/3/20075/4/2007PCANC
DetailsForrest France
kenny; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
INSP-Sprinkler Rough-in2/8/20072/9/20072/9/2007APASS
DetailsTroy Cobbley
1st and 2nd floor piping roughin passed. These two floors are ok to cover. 3rd floor can not be covered until tenting inspection is passed. Riser not built yet. One dry pendant added in each garage. Inspection performed by Brian Johnson.
INSP-Supply line flush12/6/200612/6/200612/6/2006PPART
DetailsForrest France
UG supply line flush completed.
INSP-Supply line flush11/29/200611/30/200611/30/2006ACANC
DetailsTroy Cobbley
bryan was unable to do the flush today
INSP-Sprinkler Rough-in/Hydro11/29/200611/30/200611/30/2006APASS
DetailsTroy Cobbley
Underground hydro test passed
INSP-Sprinkler Rough-in9/1/20069/1/20069/1/2006PPART
DetailsForrest France
UG fire service supply line is good for cover.
FIR-Aging Inspection3/23/20063/23/20063/23/2006 DEFR
DetailsForrest France
Work in progress.