INSP-Final Inspection | 3/14/2007 | 3/15/2007 | 3/15/2007 | A | PASS |
Forrest France
|
|
|
Final fire sprinkler inspection passed, noted missing escutcheons installed while on site.
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2007 | 3/14/2007 | 3/14/2007 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2007 | 3/13/2007 | 3/13/2007 | P | NR |
Forrest France
|
|
|
Per phone call from contractor, system is not ready for inspection.
|
INSP-Sprinkler Rough-in/Hydro | 11/4/2006 | 11/6/2006 | 11/6/2006 | A | PART |
Forrest France
|
|
|
Repiped areas on the 3rd floor are acceptable, still need to complete tenting inspection prior to approval for cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | PART |
Forrest France
|
|
|
Completed OH rough-in inspection for building 10, noted exposed 2" CPVC riser at 2nd floor to be concealed, three areas as noted on plans and indicated to contractor are subject to freeze potential and will require relocation of piping or approved tenting method prior to cover. 1st and 2nd floors only are approved for cover at this time, DP in the garage areas are not installed.
|
INSP-Sprinkler Rough-in/Hydro | 11/1/2006 | 11/2/2006 | 11/2/2006 | P | CANC |
Forrest France
|
|
|
No time to complete this inspection.
|
FIR-Aging Inspection | 5/16/2006 | 5/16/2006 | 5/17/2006 | | DONE |
Forrest France
|
|
|
The building is currently still under construction, work in progress.
|