Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00410
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 121 N 9TH ST Unit: 100
Project NameSPR PLAZA 121 VANILLA-302
Customer Number 
ePlanReview 
Description
(NO TENANT - VANILLA FINISH - PLAZA 121 - STE 302) To modify the existing fires sprinkler system to finish a 2,401-ft/2 tenant space located on the 3rd floor of an existing 76,680-ft/2, 6 story building. This permit is for a "vanilla finish". A separate permit may be required for occupancy. Fire sprinkler work is related to new interior nonbearing walls and ceilings. This building is required to be fully fire sprinklered. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-01799.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/6/200512/6/200512/6/2005PPASS
DetailsForrest France
Final fire sprinkler inspection passed.
INSP-Sprinkler Rough-in/Hydro11/28/200511/29/200511/29/2005AFAIL
DetailsForrest France
The installation appears satisfactory, however, no approved plans were available on site for review or verification. Final will require stamped plans and notes on site for inspection, will also need ceiling tile and canopies installed.