Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR05-00466
StatusFinaled
Name ST ALPHONSUS HOSPITAL
Site Address 1055 N CURTIS RD
Project Namealm -St Al's Central Tower Add
Customer Number 
ePlanReview 
Description
To relocate the communication cable between the FACP located in the South Tower, First Floor, Chiller Room and the FACP located in the North Tower, Basement Electrical Room. This relocation is to accommodate the demolition of the exiting link. The PDS Fire Inspector shall test communication cables on both sides of each FACP and random signals in South Tower and North Tower to verify a complete communication loop. Apparently there are two splice points for the cable, North Tower, second floor, above ceiling in Corridor 20309 and a second one in the South Tower Second Floor, Communications/Electrical Closet, off of Corridor 22104. There are no written comments. Approval is subject to PDS Fire Inspector field verification.

The associated building permit (BLD05-00634) is to construct approximately 105 feet of non-combustible, smoke partition walls & doors as an access corridor between the existing South & North Towers of SARMC. Doors shall have a positive latching hardware and be capable of resisting smoke transfer between the corridor and adjoining areas. To transfer all existing life-safety features for sprinkler suppression, alarm, communication, medical gas services, etc. from the existing pedestrian walkway link between the towers to be within this new corridor access between towers, constructed in accordance with Secs. 407.3 & 710, 2003 IBC for an "I2" occupancy. After the new work is completed the existing link & support structure will be demolished to allow the continued construction of the central tower to proceed. Drs (ST ALPHONSUS CENTRAL TOWER)(2ND LEVEL CORRIDOR) A "Letter of Compliance" is required for approval for the use of this area.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing8/2/20058/3/20058/3/2005APASS
DetailsTroy Cobbley
Fire alarm permit finaled.
INSP-Final Inspection8/3/20058/3/20058/3/2005PPASS
DetailsTroy Cobbley
Permit finaled