Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00475
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 398 S 9TH ST Unit: 290
Project NameBODO BLDG #4 - SPR
Customer Number 
ePlanReview 
Description
(STRATTON - BODO BLDG #4 - SUITE 290) To modify and existing shell system to create a 2,520-ft/2 office tenant space, located on the 2nd floor of BODO Building #4 (Northeast corner). Fire sprinkler work is related to interior nonbearing walls, suspended ceilings. This building is fire sprinklered for building area increase and for fire area. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-02024.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/31/200511/1/200511/1/2005APASS
DetailsForrest France
Fire sprinkler permit passed inspection.
INSP-Sprinkler Rough-in10/28/200510/31/200510/31/2005AFAIL
DetailsForrest France
Canopies are missing at confrence room heads, remove ssu as discussed.
INSP-Sprinkler Rough-in/Hydro10/17/200510/17/200510/17/2005PFAIL
DetailsForrest France
Heads in two locations are overspaced off walls, remove uprights that are not required above the drop ceiling.