Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00549
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 960 S BROADWAY AVE Unit: 240
Project NameSPR HERSHEY-UNIVERISY PLAZA240
Customer Number 
ePlanReview 
Description
(HERSHEY)(UNIVERSITY PLAZA-STE 240) To remove and replace all existing sprinklers to standard spray, quick response pendants, add 2 and relocate 13 for the remodel of an existing 3,500-ft/2 office, located on the second floor. Fire sprinkler work is related to selective demolition of interior nonbearing partitions and ceilings, with the construction of new interior noncombustible partitions and the installation of suspended ceilings in areas were it was removed. This building is fully fire sprinklered. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit BLD05-01981.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/16/20059/16/20059/16/2005PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in/Hydro9/8/20059/8/20059/8/2005APART
DetailsForrest France
Overhead fire sprinkler rough-in is good for cover, will final when ceiling tile has been installed.