Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR05-00590
StatusFinaled
Name PEAK ALARM
Site Address 6280 N EAGLE RD
Project Namealm - Target T1230
Customer Number 
ePlanReview 
Description
To provide an internet communication link in lieu of the phone line to Target's central station. It has been designed per NFPA 72; 8.5.4, "Other Transmission Technologies" and has been listed by UL for the use. A network card (powered by an auxiliary power supply) will be provided in the Radionics D9412 which will connect to the local Ethernet which in turn makes connectivity with the world wide web. Data is transmitted through the Ethernet, over the world wide web, into the central station via the Ethernet into a network card in the central station receiver. The entire communication process has been UL tested, letters are included in the packet. No FACP battery calculations required as there is no change in FACP load. The aux power supply calcs appear to be sufficient, 12 a-h batteries shall be provided. The PDS Fire Inspector shall field verify FA signals (alarm, supervisory and trouble) are received by the central station in the required time frame.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/28/20107/29/20107/29/2010APASS
DetailsTroy Cobbley
Permit finaled
FIR-Aging Inspection1/6/20061/6/20061/6/2006 NR
DetailsTroy Cobbley
Contractor is waiting for an informational letter on the generator to give to Mary.