Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00666
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 755 W FRONT ST Unit: 300
Project NameCOLLIERS INTERNATIONAL BODO 7
Customer Number 
ePlanReview 
Description
To provide total notification and three duct detectors for HVAC shutdown in the TI space encompassing the entire third floor. The existing required manual fire alarm system includes sprinkler monitoring, elevator recall/shutdown, door release, fire/smoke damper control, HVAC shutdown and notification throughout. (speaker/strobes are required in the theater only, the remainder of the building is horn/strobes). The shell/core fire alarm permit FIR05-00076 shall be finaled prior to occupancy of this space.

The associated building permit (BLD 05-02358) is to construct a 10,130 square foot office tenant space located on the 3rd story of "BODO Building #7". The building shell was constructed under permit BLD04-01324. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, interior doors, interior windows, suspended ceilings, millwork, and finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW** (COLLIERS INTERNATIONAL - BODO BLDG #7 - 3RD STORY) This building is fire sprinklered for fire area and to allow the multitheater complex.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/10/20063/13/20063/13/2006APASS
DetailsForrest France
Shell alarm permit is complete, TI alarm finaled.
INSP-Final Inspection2/27/20062/28/20062/28/2006PPART
DetailsForrest France
Final pending shell alarm final.
INSP-Alarm Testing11/22/200511/23/200511/23/2005PPART
DetailsForrest France
Three notification devices were corrected while on site, duct detectors tested okay, fire alarm tested acceptable, final pending shell permit final.
INSP-Alarm Testing11/21/200511/22/200511/22/2005PCANC
DetailsForrest France
INSP-Alarm Testing11/21/200511/21/200511/21/2005PCANC
DetailsForrest France
Inspection has been rescheduled for 11/22 pm as discussed.