INSP-Alarm Testing | 7/13/2009 | 7/14/2009 | 7/14/2009 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 7/10/2009 | 7/13/2009 | 7/13/2009 | A | FAIL |
Troy Cobbley
|
|
|
An additional strobe needs to be added in an alcove in the first floor electrical room and almost all of the horn/strobes on the second floor, in the residential rooms did not operated. Per Guy it appears that the notification circuit had been damaged. The map needs to be provided at the annunciator.
|
INSP-Final Inspection | 7/9/2009 | 7/10/2009 | 7/10/2009 | A | PART |
Forrest France
|
|
|
Fire alarm testing completed satisfactory today includes the FACP, nac panels, remote annunciator, elevator recall functions, mag locks at exit doors, signals sent to remote station, all initiating devices and sprinkler monitoring per new plan resubmittals. Items needed for final include retest the non-functional duct detector at the roof, provide correct addressing at three smoke detectors, repair one MP and replace one h/s on the first floor, provide a map at the annunciator, show locations of hoistway sd and hd on the site map, verifiy functionality of notification appliances throughout.
|
INSP-Final Inspection | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | NR |
Forrest France
|
|
|
Need to provide approved plan resubmittals indicating field modifications and changes to system installation which differ significantly from the original design. Also need to coordinate field acceptance testing with the fire sprinkler contractor for system interconnections.
|
INSP-Final Inspection | 6/3/2009 | 6/4/2009 | 6/5/2009 | P | FAIL |
Forrest France
|
|
|
Building walkthrough completed for scope of fire alarm permit work, noted several areas on plans in need of adjustment, repair, provision or modification. Some items such as elevator recall are not ready for testing. Missing relays for mag locks at two main entry doors, MP stations at the west open area are not yet installed, plans need to reflect field installation including actual number of nac panels/circuts, added sprinkler monitor points at floor control manifolds, new relays, added devices etc. See stamped drawings for red-lined annotations.
|
FIR-Aging Inspection | 8/15/2006 | 8/15/2006 | 8/15/2006 | | DONE |
Forrest France
|
|
|
wip
|