INSP-Final Inspection | 7/14/2009 | 7/15/2009 | 7/14/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled per requirement of last inspection entry. Items have been corrected.
|
INSP-Final Inspection | 7/9/2009 | 7/10/2009 | 7/10/2009 | A | PART |
Forrest France
|
|
|
Final pending repair of one manual pull station and replace one 30cd HS at the dining area.
|
INSP-Alarm Testing | 4/11/2007 | 4/12/2007 | 4/12/2007 | A | PART |
Forrest France
|
|
|
Alarm testing completed for the existing portion of the TI only, expansion area not completed at this time, noted dB exceeds max allowable at the restrooms, notification and initiation tested okay, need receipt of signal verification, no items on the main FACP tested- partial test of tenant only, final pending related full building upgrade permit finals.
|
FIR-Aging Inspection | 9/5/2006 | 9/5/2006 | 9/5/2006 | | DONE |
Forrest France
|
|
|
wip
|