Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00837
StatusFinaled
Name PROTEX
Site Address 522 W BROAD ST
Project Namealm - FRONT 5 BUILDING
Customer Number 
ePlanReview 
Description
To provide a single horn/strobe in the main lobby and one duct smoke detector for HVAC shutdown in the TI space. No written comments. Battery and voltage drop calculations appear to be sufficient. Provide revised building map to PDS Fire Inspector with the architectural changes and duct detector location at time of inspection.

The associated building permit (BLD05-01715) is to remodel to construct a 2,210 sq.ft. office tenant on the first floor in an existing building per approved plans and engineering in a space that was created under a building core renovation under BLD04-01386. The remodel will separate out the 750 sq. ft. upper level from this first floor space and a separate permit will be required for any tenant to occupy that upper floor area. Work to include relocating the stairway to the upper level towards the south exterior wall, some new floor infill in former stair opening, a new exterior opening/door in existing masonry wall, new exterior concrete landing/sidewalk section with reinforced concrete retaining wall and guard per code, new interior walls, new interior doors and windows, interior finish, fire sprinkler work, new mechanical, and new electrical work. Special Inspection required for concrete, structural steel/welding, expansion anchors, and epoxy/adhesive anchors. A Certificate of Occupancy is to be issued when completed and approved. Other building addresses in this building are 501 W. Front Street, 519 W. Front Street, and 500 W. Broad Street. NOTE: This building is fully fire sprinklered. JCB (ADECCO)(FRONT 5 BUILDING)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/29/200512/29/200512/29/2005PPASS
DetailsForrest France
Fire alarm is acceptable for the first floor TI space.