INSP-Final Inspection | 3/20/2006 | 3/20/2006 | 3/21/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/17/2006 | 3/17/2006 | 3/17/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the elevator hat signal on 2nd floor lobby is changed, 120 volt control voltage is monitored and a hardcopy of signals is presented. Elevator is not to be used per dave hanniman
|
INSP-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | P | FAIL |
Troy Cobbley
|
|
|
Monitoring company did not receive all of the signals and they do not have information such as address and city. Also could not do the battery calcs. Need to redo the test.
|
INSP-Final Inspection | 3/15/2006 | 3/17/2006 | 3/15/2006 | A | CANC |
Troy Cobbley
|
|
|
Troy, We would like to schedule for sometime in the morning. Please call with a time. Jason, Mike, or Ken; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|