Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR05-00864
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameSPR B16 RMDL CAFE FOR FAB CENT
Customer NumberC9057
ePlanReview 
Description
MICRON BUILDING #16 REMODEL CAFE FOR FAB CENTER- (C9057) - To demo 126 existing SSP's with piping and reinstall 114 new SSP's for the remodel of the old Cafeteria for Fab Central Group located in the southwest corner of the basement of Building #16, between grid lines #5&0.8 and N&R into; (8) single hard wall offices, (2) 8 seat conference rooms, a 7,700 square foot open office area for (38) double cube offices, (24) single cube office spaces, a 1,400-ft/2 vending/non-smoking break room and a 340-ft/2 smoking break room. Fire sprinkler work is associated with the demolition of walls, ceilings with accessory equipment to remove the existing cafeteria and support areas and to construct new interior partitions and ceiling grid.
This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-00864.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/18/20065/19/20065/19/2006APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in5/10/20065/10/20065/10/2006PPART
DetailsForrest France
Hangers have been relocated for attatchment to the building structure and to meet load requirements, retaining straps at beam clamps have been installed. Overhead rough-in is okay to cover.
INSP-Sprinkler Rough-in5/5/20065/8/20065/9/2006APART
DetailsForrest France
Hangers at various locations are missing retaining straps at beam clamps, several hangers for arm-overs have been attatched to 5/8 sheetrock as a means of support-need to verify the point of attatchment will support a min. 250lbs per NFPA 13.
INSP-Final Inspection4/27/20065/4/20065/4/2006AFAIL
DetailsForrest France
The overhead sprinkler piping has been completely concealed prior to inspection for cover, it will be necessary to expose the installation for verification of code compliance. Also noted two heads at a confrence room which are spaced incorrectly.
INSP-Final Inspection2/21/20062/23/20062/23/2006APART
DetailsForrest France
Overhead fire sprinkler is complete and the installation is satisfactory at the 1400 ft/2 vending/break room and the 340 ft/2 smoking break room portion of this permit.
INSP-Conference1/17/20061/19/20061/19/2006PDONE
DetailsForrest France
On site confrence to discuss project phasing as associated with the cafeteria lunchroom completion prior to the remainder of work under this permit scope.
INSP-Conference1/17/20061/17/20061/17/2006PCANC
DetailsTroy Cobbley
mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles