Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR06-00132
StatusFinaled
Name MOUNTAIN ALARM
Site Address 1000 S VISTA AVE
Project Namealm - Reily's Church Supply
Customer Number 
ePlanReview 
Description
To provide a sprinkler monitoring system for the partially sprinklered building.

The associated building permit (BLD 05-03176) is to remodel an existing 6,555 square foot tenant space (3,284 square foot 1st story and 3,271 square foot basement) for a new retail sales tenant. Work is to include interior nonbearing walls, interior wall furring, new store front door and window system, suspended ceilings, a new stairway to the basement, a new floor in an abandoned stairway opening, and finishes. The restrooms were constructed in 1993 and are required to be maintained accessible to the disabled. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. All fire sprinkler work shall comply with NFPA 13 as regulated by the Fire Department. Exterior changes under this permit must comply with CZC05-00224. Future canopy remodel and fire sprinkler installation will be done under BLD04-02464. **CJW** (REILLY'S CHURCH SUPPLY - VISTA VILLAGE) This building is partially fire sprinklered.

The associated fire sprinkler permit (FIR 06-00037) is to remodel an existing 6,555-ft/2 tenant space (3,284-ft/2 1st story and 3,271-ft/2 basement) for a new retail sales tenant. The fire sprinkler work is for the installation of sprinkler protection on the first floor, modifications of the existing system related to the New Stairwell located in the southwest basement, constructed to the first floor, the replacement of existing uprights in the basement, the modification of interior nonbearing walls in the basement, the adding of protection for the infill area where the demolition of existing stairs and sprinklers was permitted. Future canopy remodel and fire sprinkler installation will be done under BLD04-02464. This fire sprinkler work is required to comply with the approved drawings, the plan review report, and all applicable codes. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-03176. (REILLY'S CHURCH SUPPLY - VISTA VILLAGE) This building is partially fire sprinklered. There is a fire permit for Demolition Permit under FIR06-00010 issued to the same contractor, attached to the same building permit which has not been inspected to date.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/14/20063/15/20063/15/2006APASS
DetailsForrest France
Fire alarm passed field inspection.
INSP-Final Inspection3/13/20063/14/20063/14/2006ADEFR
DetailsForrest France
Inspection to be rescheduled per phone conversation with contractor.
INSP-Final Inspection3/13/20063/13/20063/13/2006PFAIL
DetailsTroy Cobbley
Telephone troubles were not registering on the panel. No inspection performed.