Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR06-00188
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 1600
Project NameUS BANK-16TH FLR
Customer Number 
ePlanReview 
Description
Adding 13 new heads and relocating 11 existing heads to compy with head spacing requirements. Remodeling a 9,519 sq.ft. office area located on the 16th floor per approved plans. Work to include, selective interior nonbearing demolition, construction of new noncombustible partitions to create individual office spaces, breakroom, small conference rooms, reception area, and open office areas, installation of a new suspended ceiling system related lighting, miscellaneous related interior finishes. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/8/20068/8/20068/8/2006PPASS
DetailsForrest France
c/n item has been completed, final fire sprinkler inspection passed.
INSP-Sprinkler Rough-in7/25/20067/26/20067/26/2006APART
DetailsForrest France
Two heads at common area SE side are overspaced and will need to be relocated, the remainder of overhead rough-in is good for cover at the drop ceilings.
INSP-Sprinkler Rough-in/Hydro6/12/20066/13/20066/13/2006APART
DetailsForrest France
Overhead rough-in for phase two of the project is acceptable for cover.
INSP-Sprinkler Rough-in4/14/20064/17/20064/17/2006APART
DetailsTroy Cobbley
sprinkler piping for phase 1 is ok to cover.