INSP-Final Inspection | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PASS |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 5/25/2006 at 2:49:18 PM. Contact: ###-####.
|
DOC - Permit Finaled | | | 5/26/2006 | | PASS |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/25/2006 | 5/25/2006 | P | FAIL |
Troy Cobbley
|
|
|
Provide hanger on relocated head immediatley outside of the new room, right above doors into room.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/23/2006 | 5/24/2006 | P | CANC |
Forrest France
|
|
|
Cancel inspection per contractor, to be rescheduled when ready.
|