INSP-Final Inspection | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
FIR-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/21/2008 | P | DONE |
Forrest France
|
|
|
Permit ready for final.
|
FIR-Aging Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | PASS |
Forrest France
|
|
|
The UG fire supply line permit work is complete and ready for final.
|
INSP-Sprinkler Rough-in/Hydro | 8/1/2006 | 8/1/2006 | 8/2/2006 | P | PART |
Forrest France
|
|
|
UG hydrostatic test performed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 6/14/2006 | 6/15/2006 | 6/15/2006 | A | PART |
Forrest France
|
|
|
UG supply line work appears satisfactory, acceptable for cover per installation matching approved plans which were not available on site at the time of inspection. Notified contractor to make available the proper documents at next inspection.
|
INSP-Sprinkler Rough-in | 6/14/2006 | 6/14/2006 | 6/15/2006 | P | NR |
Forrest France
|
|
|
Per phone call from contractor the field work is still not ready for inspection, to be rescheduled.
|
INSP-Sprinkler Rough-in/Hydro | 6/13/2006 | 6/13/2006 | 6/14/2006 | P | NR |
Forrest France
|
|
|
Per contractor, the project is not ready for inspection at this time- to be rescheduled.
|