INSP-Final Inspection | 12/7/2006 | 12/8/2006 | 12/8/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 12/7/2006 | 12/7/2006 | 12/7/2006 | P | CANC |
Troy Cobbley
|
|
|
wrong inspection called in
|
INSP-Supply line flush | 5/3/2006 | 5/3/2006 | 5/3/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed. Underground hydro test passed.
|
INSP-Sprinkler Rough-in | 5/2/2006 | 5/2/2006 | 5/2/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Troy Cobbley
|
|
|
The underground supply is ok to cover. The routing of the piping has been changed. Instead of supplied from the south side of the driveway it is now tied into the north side. One less 45 elbow has been used but distance is farther. This change needs to be reflected on the overhead submittals. Also the contractor needs to receive fire dept approval for running the piping under the utility pad and possible placement of the fire dept connection.
|