INSP-Final Inspection | 6/5/2006 | 6/5/2006 | 6/5/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | PASS |
Forrest France
|
|
|
Corrections have been made, fire sprinkler work passed inspection, okay to final.
|
INSP-Sprinkler Rough-in/Hydro | 5/30/2006 | 5/30/2006 | 5/30/2006 | P | FAIL |
Troy Cobbley
|
|
|
Failed: 2 ECOH heads obstructed by exposed round duct. Stockroom floor coverage is lacking/obstructed by HVAC/Ducts
Contact: Steve - Cover; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|