INSP-Final Inspection | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PASS |
Forrest France
|
|
|
The correct sample tubes have been installed, inspection passed.
|
INSP-Final Inspection | 6/2/2006 | 6/6/2006 | 6/6/2006 | A | FAIL |
Forrest France
|
|
|
Sample tubes must meet mfg. specifications for the correct size, spacing, number of perforations, and length of tube installed corresponding to the ductwork employed.
|