Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR06-00326
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 420 W MAIN ST Unit: 202
Project NameSPR ERSTAD OFFICE EXP
Customer Number 
ePlanReview 
Description
(ERSTAD OFFICE EXPANSION-VELTEX BLDG-STE 202) To add 2 new SSP's and 2 new SSU's to accommodate the remodel an existing 1,528-ft/2 office tenant space by expanding into adjacent 328-ft/2 vacant space to create one office area for a total 1,856-ft/2. Fire sprinkler work is related to the construction of a new noncombustible partition. This building is fully fire sprinklered any alterations. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD6-00755.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/26/20082/26/20082/26/2008PPASS
DetailsForrest France
Fire sprinkler permit work finaled.
INSP-Final Inspection2/25/20082/25/20082/25/2008PPART
DetailsForrest France
Pending BLD permit final inspection.
INSP-Final Inspection5/22/20065/23/20065/23/2006PPART
DetailsForrest France
Project is not ready for final inspection as walls and ceilings which create the separation between sprinklers are not complete at this time. Overhead rough-in is acceptable for cover.