Permit NumberFIR06-00375
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 9050 W OVERLAND RD
Project NameSPR ANDERSON BLACKEAGLE BLDG
Customer Number 
ePlanReview 
Description
ANDERSON BLACK EAGLE - (SHELL & CORE) - To install a complete overhead with separate floor zoned, light hazard fire protection system in a new 32,640-ft/2, two story concrete floor, concrete tilt-up exterior walls, metal stud and roof office and retail shell and core building. This building is to be fully fire sprinklered for area increase. The first Floor: 15,950-ft/2, Second Floor: 16,690-ft/2. This is a shell and core permit only. Separate tenant improvement permits will be required to finish this building for occupancy. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire service supply was permitted under FIR06-00168. This fire permit is attached to building permit: BLD05-03105.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/6/200611/7/200611/7/2006APASS
DetailsForrest France
Required corrections have been completed, missing outside bell sign installed while on site, shell sprinkler work passed final inspection.
INSP-Final Inspection11/3/200611/6/200611/6/2006ADEFR
DetailsForrest France
Pending alarm permit final.
INSP-Final Inspection11/3/200611/3/200611/3/2006PCANC
DetailsForrest France
Contact: Todd K; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
INSP-Final Inspection11/1/200611/2/200611/2/2006ADEFR
DetailsForrest France
Pending unfinished alarm work.
INSP-Sprinkler Rough-in/Hydro10/30/200610/31/200610/31/2006APART
DetailsForrest France
AG hydrostatic test for the two wet systems passed, noted to contractor the FDC piping will need to be hydro tested as well.
INSP-Sprinkler Rough-in/Hydro10/30/200610/30/200610/30/2006PCANC
DetailsTroy Cobbley
wrong inspection called in
INSP-Sprinkler Rough-in10/9/200610/10/200610/10/2006PPASS
DetailsTroy Cobbley
Forward flush of the backflow preventor passed. Rough-in inspection for the first and second floors passed. One additional EQ brace is needed at 4" second floor main in the northeast corner.
INSP-Sprinkler Rough-in9/15/20069/15/20069/15/2006PPASS
DetailsTroy Cobbley
The sprinkler piping above the hardlids on the second floor are ok to cover. This includes the hardlid 1/3 of the way up the north facing stairs.