INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/9/2007 | 1/11/2007 | 1/12/2007 | A | FAIL |
Forrest France
|
|
|
Final pending correct wiring for power supply at the flow switch.
|
INSP-Supply line flush | 1/9/2007 | 1/10/2007 | 1/10/2007 | P | FAIL |
Troy Cobbley
|
|
|
kurt; Phone #: ###-#### I called 30 minutes before inspection and got no answer. Nobody at job site knew of kurt. Riser was not set up for flush either. Will need to be rescheduled.
|
INSP-Sprinkler Rough-in | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | PART |
Forrest France
|
|
|
OH rough-in is acceptable for cover, noted items on previous c/n have been completed, noted possible light fixture obstructions at 1st floor bedroom and one hall due to close proximity to electrical junction boxes, missing drop at one location.
|
INSP-Final Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 | P | FAIL |
Troy Cobbley
|
|
|
Provide approval notes that accompany the approved plans, tenting is inadequate and needs modified in several locations, provide additional hangers on the 1 1/2" main in the west end of the basement, sidewall heads in the garage appear to be overspaced and provide as-built drawings and hydraulic calculations that include all of the piping changes and hydraulic calculation changes including the slope from the street to the riser
|